• Skip to primary navigation
  • Skip to main content
  • Skip to footer

Environmental Engineering, Consulting and Vertical/Civil Construction across Alaska

Brice Engineering

Brice was built on family values going back to our founders.
That means, we'll always have your back.

  • Home
  • Mission
    • Brice – the Backstory
  • What We Do
    • Engineering
    • Environmental Consulting
    • Construction
    • Aerial Imaging
  • Projects
  • Careers
  • News
    • News
    • Published Articles
  • Contact

USACE Alaska Load Bank Installation, Eareckson AS

Client: USACE Alaska

Location: Shemya Island, Alaska

Value: $1,380,458

Completion Year: 2018

Scope of Work:

  • Installation
  • Electrical
  • Logistics

Brice purchased and installed a 5 MW load bank to be used in the proof loading of the power plant’s engine/generators at Eareckson Air Station (EAS) after a major repair or engine overhaul. We connected the load bank to the active power plant located in Building 3049.

Brice purchased a load bank from ASCO that met the specification of the US Air Force 611th Civil Engineer Squadron (CES), and transported it to EAS. We worked with the factory to permanently attach the load bank to a shipping flat to reduce potential handling damage and point loading under the support stanchions at the final installed location. The load bank is typically designed for the outdoors. Brice modified the design for installation indoors at Building 3051 to protect the load bank from the extreme wind, temperatures, and precipitation on Shemya Island. We performed minor modifications to the building to enable proper installation. Specifically, we replaced 48” x 6’ of the building paneling and insulation, to allow the proper airflow needed for the load bank. We also added higher capacity fans to overcome the additional air resistance found indoors. We successfully completed the load bank installation exceeding customer’s expectations.

Upon request of the 611th CES, we installed a SCADA unit, which allowed the power plant operators to control the load bank from the control panel in Building 3049.

Footer

ANC 8(a) Advantage

As an ANC 8(a) firm, Brice is eligible to receive sole source contracts regardless of dollar size, with no upper limit, compared with traditional 8(a) enterprises which are held to a sole source contract limit of $4 million.
Learn More

Recent & Relevant Projects

  • Underground Storage Tank Removal and Disposal, Dawley Property, Alaska
  • Lead Mitigation and Interior Cleaning, Ketchikan and Kotzebue, Alaska
  • Site Investigation, Air Force Auxiliary Field FUDS, Amchitka Island, Alaska
  • Cultural and Paleontological Monitoring, Yukon Delta National Wildlife Refuge, Alaska
  • Cultural Resources Inventory, Western Alaska

View More Projects

  • Family Built
  • Excellence Delivered
  • Uniquely Agile
Top
Proud Subsidiary of Calista Corporation
Copyright © 2021 • Brice Engineering All rights reserved. Website by Sundog Media, LLC Logo Sundog Media, LLC.