Brice Engineering repaired sections of the Waste Heat Loop System at Eareckson Air Station (EAS) on Shemya Island, Alaska. Our scope of work involved site preparation and material staging; excavation; installation of new PP-RCT piping, valves, and appurtenances; installation of steel piping and mechanical components such as circulating pumps; testing and commissioning; backfill, compaction, and Read More
Construction
Short-term Fuel Pier Repairs, EAS, Shemya, Alaska
In 2021, Brice completed a fast-track design build construction project to perform short-term repairs to the Eareckson Air Station (EAS) fuel pier on Shemya Island, Alaska. In February 2020, powerful waves had crashed into the fuel pier, stripping off nearly the entire eastern berthing face, spilling its concrete structural fill. Three holes were left behind Read More
USACE Alaska Load Bank Installation, Eareckson AS
Brice purchased and installed a 5 MW load bank to be used in the proof loading of the power plant’s engine/generators at Eareckson Air Station (EAS) after a major repair or engine overhaul. We connected the load bank to the active power plant located in Building 3049. Brice purchased a load bank from ASCO that Read More
Critical Public Facilities Support of FEMA, Saipan, North Mariana Islands
Project Highlights Completed the project on budget and within the highly compressed schedule of 2.5 months Commended by POD Commanding General, Brig. Gen. Thomas Tickner: “Typhoon Yutu is one in a long line of natural disasters to impact the Pacific. From tsunamis, to earthquakes, typhoons and flooding…nearly every country in this region has experienced the Read More